135 Coronation Dr End of Trip Facility

End fo trip facility
End fo trip facility
End fo trip facility
End of Trip Facility - 135 Coronation Dr
End fo trip facility
1 / 5

After being engaged in this project back in 2017 for the initial design, nettletontribe took the opportunity to reinvigorate the space after it was devastated by the floods in early 2022. As a result, the end-of-trip and basement lift lobbies brought a new life to the space. The updated finishes and graphics installed created a warm and inviting space, which reflects a modern end-of-trip facility.

The soft green finishes compliment the walnut timbers and reflect a soft and calming environment for tenants to unwind.

End fo trip facility