135 Coronation Drive
nettletontribe revitalised the space following the devastating floods in early 2022. AMP Capital's objective was to create a more sophisticated and contemporary atmosphere while preserving the incorporation of Milton Green branding and a sense of place.
The introduction of new finishes and graphics in the lift lobbies transformed into warm and inviting areas that reflected a modern and timely end of trip facility. The graphics, while minimalistic, maintained a sense of sophistication and seamlessly integrated Milton Green branding.
The modern finishes created an inviting atmosphere. The soft green and walnut timber finishes contributed to a calm and soothing environment, while the graphics conveyed a consistent sense of sophistication in line with the lift lobby. The only graphic that remained from the previous design was the map, which provided users with a sense of place and location. It was updated to seamlessly align with the new EOTF design, reflecting the same language of minimalism, warmth, calmness, and modernism.

